Modes de fonctionnement :
Value Bucking (Stem Optimization)
The system processes the stem into products according to a length / diameter combination list (price list). Each combination has an assigned value and the head bucks the stem to generate the maximum value.
Example of a price matrix
Diameter (mm) | |||||||||||||
90 | 100 | 110 | 120 | 140 | 160 | 180 | 200 | 250 | 300 | 350 | 400 | ||
Length (cm) |
254 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 |
320 | 0 | 0 | 0 | 200 | 200 | 200 | 200 | 200 | 200 | 200 | 200 | 200 | |
500 | 0 | 0 | 0 | 0 | 0 | 400 | 400 | 400 | 400 | 400 | 400 | 400 |